<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[RS-485 Multi-Drop Bus Reflection and Biasing Issues in Smart Meter Substation Loops]]></title><description><![CDATA[<h3>Substation Case Study: 64-Meter RS-485 Daisy Chain Failures</h3>
<p dir="auto">During commissioning of an industrial metering gateway polling 64 DLMS meters over an 800-meter RS-485 bus, we observed intermittent framing errors (CRC-16 HCS/FCS mismatch) when polling meters located beyond meter #40.</p>
<h4>Oscilloscope Measurements</h4>
<ul>
<li><strong>Differential Voltage ($V_A - V_B$)</strong>: Ringing amplitudes exceeded 1.8V during signal transitions.</li>
<li><strong>Idle Bus State</strong>: Floating between -50mV and +80mV, falling into the RS-485 receiver indeterminate zone (-200mV to +200mV).</li>
</ul>
<h4>Corrective Engineering Measures</h4>
<ol>
<li><strong>120-Ohm Termination Resistors</strong>: Installed strictly at the physical two extreme ends of the daisy chain (Gateway and Meter #64). Removed intermediate termination switches from middle meters.</li>
<li><strong>Fail-Safe Biasing</strong>: Added 680-ohm pull-up on Line A (+5V) and 680-ohm pull-down on Line B (GND) at the gateway master to hold idle voltage at $+250\text{ mV}$.</li>
<li><strong>Baud Rate Optimization</strong>: Standardized at 9600 bps, 8N1 with shielded twisted pair (STP, 24 AWG, $120,\Omega$ characteristic impedance).</li>
</ol>
<p dir="auto">Result: 100% packet success rate across all 64 nodes over continuous 72-hour run.</p>
]]></description><link>https://dlms.sharur.org/topic/32/rs-485-multi-drop-bus-reflection-and-biasing-issues-in-smart-meter-substation-loops</link><generator>RSS for Node</generator><lastBuildDate>Fri, 16 Oct 2026 19:48:57 GMT</lastBuildDate><atom:link href="https://dlms.sharur.org/topic/32.rss" rel="self" type="application/rss+xml"/><pubDate>Sat, 22 Aug 2026 12:36:18 GMT</pubDate><ttl>60</ttl><item><title><![CDATA[Reply to RS-485 Multi-Drop Bus Reflection and Biasing Issues in Smart Meter Substation Loops on Sat, 22 Aug 2026 12:36:27 GMT]]></title><description><![CDATA[<p dir="auto">Proper biasing is essential! Without fail-safe bias resistors, when the transmitter driver enters high-impedance tri-state mode between frames, ambient electrical noise triggers spurious start bits on UART controllers, generating <code>Invalid Opening Flag</code> errors.</p>
]]></description><link>https://dlms.sharur.org/post/75</link><guid isPermaLink="true">https://dlms.sharur.org/post/75</guid><dc:creator><![CDATA[david_miller]]></dc:creator><pubDate>Sat, 22 Aug 2026 12:36:27 GMT</pubDate></item></channel></rss>