<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[What is the standard intuitive structure of OBIS 6-tuple codes (A.B.C.D.E.F) in Blue Book?]]></title><description><![CDATA[<blockquote>
<p dir="auto"><img src="https://dlms.sharur.org/assets/plugins/nodebb-plugin-emoji/emoji/android/1f6e1.png?v=666d1e6b6e4" class="not-responsive emoji emoji-android emoji--shield" style="height:23px;width:auto;vertical-align:middle" title="🛡" alt="🛡" />️ <strong>Technical Redaction &amp; Safe Harbor Warning</strong>:<br />
Proprietary tariff schemes and meter registers have been replaced with standard IEC 62056-61 OBIS definitions.</p>
</blockquote>
<p dir="auto">When reading the DLMS Blue Book Ed. 17 (IEC 62056-62 Clause 5.1), the 6-tuple OBIS hierarchy <code>A.B.C.D.E.F</code> (e.g. <code>1.0.1.8.0.255</code> and <code>1.0.32.7.0.255</code>) seems overwhelming with hundreds of pages of object dictionaries.<br />
For example, inspecting a raw GET-Request:</p>
<pre><code class="language-hex">C0 01 C1 00 03 01 00 01 08 00 FF 02 00
</code></pre>
<p dir="auto">How do experienced metering engineers memorize and distinguish these 6 numeric groups in practical development?</p>
]]></description><link>https://dlms.sharur.org/topic/63/what-is-the-standard-intuitive-structure-of-obis-6-tuple-codes-a.b.c.d.e.f-in-blue-book</link><generator>RSS for Node</generator><lastBuildDate>Fri, 16 Oct 2026 19:14:30 GMT</lastBuildDate><atom:link href="https://dlms.sharur.org/topic/63.rss" rel="self" type="application/rss+xml"/><pubDate>Sun, 23 Aug 2026 03:51:20 GMT</pubDate><ttl>60</ttl><item><title><![CDATA[Reply to What is the standard intuitive structure of OBIS 6-tuple codes (A.B.C.D.E.F) in Blue Book? on Sun, 23 Aug 2026 03:51:25 GMT]]></title><description><![CDATA[<p dir="auto">However simple this breakdown looks, it clarifies the entire Blue Book structure.<br />
Now I can easily recognize why <code>1.0.2.8.0.255</code> is active export energy (since C=<code>2</code> represents active export -A, and D=<code>8</code> represents cumulative integration).<br />
Per IEC 62056-61 Clause 4.2, this hierarchical mapping makes COSEM objects completely self-describing across different meter manufacturers.</p>
]]></description><link>https://dlms.sharur.org/post/235</link><guid isPermaLink="true">https://dlms.sharur.org/post/235</guid><dc:creator><![CDATA[sarah_jenkins]]></dc:creator><pubDate>Sun, 23 Aug 2026 03:51:25 GMT</pubDate></item><item><title><![CDATA[Reply to What is the standard intuitive structure of OBIS 6-tuple codes (A.B.C.D.E.F) in Blue Book? on Sun, 23 Aug 2026 03:51:23 GMT]]></title><description><![CDATA[<p dir="auto">Instead of trying to memorize individual numbers, think of OBIS as a <strong>6-level semantic classification system</strong> per Blue Book Section 4.2:</p>
<table class="table table-bordered table-striped">
<thead>
<tr>
<th style="text-align:left">Group</th>
<th style="text-align:left">Standard Meaning</th>
<th style="text-align:left">Intuitive Rule</th>
<th style="text-align:left">Practical Examples</th>
</tr>
</thead>
<tbody>
<tr>
<td style="text-align:left"><strong>A</strong></td>
<td style="text-align:left">Medium / Abstract</td>
<td style="text-align:left">What physical commodity?</td>
<td style="text-align:left"><code>1</code> = Electricity, <code>7</code> = Gas, <code>8</code> = Water, <code>9</code> = Heat</td>
</tr>
<tr>
<td style="text-align:left"><strong>B</strong></td>
<td style="text-align:left">Channel</td>
<td style="text-align:left">Which internal path?</td>
<td style="text-align:left"><code>0</code> = No channel / Total, <code>1..64</code> = Sub-meter channels</td>
</tr>
<tr>
<td style="text-align:left"><strong>C</strong></td>
<td style="text-align:left">Physical Quantity</td>
<td style="text-align:left">What physical parameter?</td>
<td style="text-align:left"><code>1</code> = Active Energy (+A), <code>31/32/33</code> = Voltage (L1/L2/L3), <code>11/12/13</code> = Current</td>
</tr>
<tr>
<td style="text-align:left"><strong>D</strong></td>
<td style="text-align:left">Measurement Type</td>
<td style="text-align:left">How is it measured/processed?</td>
<td style="text-align:left"><code>8</code> = Cumulative Energy (integral), <code>7</code> = Instantaneous value, <code>4</code> = Max demand</td>
</tr>
<tr>
<td style="text-align:left"><strong>E</strong></td>
<td style="text-align:left">Tariff / Rate</td>
<td style="text-align:left">Which pricing tier?</td>
<td style="text-align:left"><code>0</code> = Total (all tariffs), <code>1</code> = T1, <code>2</code> = T2, <code>3</code> = T3</td>
</tr>
<tr>
<td style="text-align:left"><strong>F</strong></td>
<td style="text-align:left">Billing Period</td>
<td style="text-align:left">Which historical snapshot?</td>
<td style="text-align:left"><code>255</code> = Current real-time value, <code>0</code> = Previous billing period, <code>1</code> = 2 periods ago</td>
</tr>
</tbody>
</table>
<p dir="auto">For example:</p>
<ul>
<li><code>1.0.1.8.0.255</code> -&gt; Electricity (<code>1</code>) -&gt; Channel 0 (<code>0</code>) -&gt; Active import (<code>1</code>) -&gt; Cumulative energy (<code>8</code>) -&gt; Total tariff (<code>0</code>) -&gt; Current (<code>255</code>) = <strong>Total Active Import Energy (+A)</strong>.</li>
<li><code>1.0.32.7.0.255</code> -&gt; Electricity (<code>1</code>) -&gt; Channel 0 (<code>0</code>) -&gt; Phase B Voltage (<code>32</code>) -&gt; Instantaneous (<code>7</code>) -&gt; Real-time (<code>255</code>) = <strong>Phase B Instantaneous Voltage</strong>.</li>
</ul>
]]></description><link>https://dlms.sharur.org/post/234</link><guid isPermaLink="true">https://dlms.sharur.org/post/234</guid><dc:creator><![CDATA[alex_turner]]></dc:creator><pubDate>Sun, 23 Aug 2026 03:51:23 GMT</pubDate></item></channel></rss>